9/09/2015

Loading in the set for “Available Light” at the Drexel Armory was tough. It’s notoriously known as the summer that crew got super strong. The days were long, the air conditioning was weak, and every part of the set was heavy. There were so many platforms that needed to be lifted above our heads to create the various elevated stages. A bunch of us would end our days with margaritas at the taco joint down the street. It was hard work, but the people made it fun!

9/09/2015
Available Light
Keighty McLallen